This speculative distribution center was a design-build project located on a 44-acre site, including 60 dock positions and a 36-foot clear height.
Pepper self performed the concrete and drywall scope for the project. Concrete work consisted of foundations, excavations, dock pit installation, slab on grade prep and pour, hardener / densifier and site concrete, including dock aprons, dolly pads, sidewalks and curbs. Drywall work included roof blocking, interior framing and hanging and exterior soffit framing.
Team
Owner
Sunbeam Development Corporation
Architect
JRA Architecture, LLC
Project Location
Clayton, Indiana